Provincial Datacenter & Interprovincial Link
DeliveredDepartment of Science & Technology, Dong Nai Province · 2003–2010 · IT Technician
The department's core applications had grown up one machine at a time, in a room never designed for them. I worked on the server room that replaced it, the virtualisation layer beneath it, and the offsite link that put the data outside the building that produced it.
The problem
The department's core applications had grown up one machine at a time. Each had its own server, its own power arrangement and its own failure mode, in a room that was never designed to hold them. A power cut, a hot afternoon or one dead disk could take out a service nobody had planned to lose.
The task was to give those applications a room and a platform that matched how much the department now depended on them.
What I built
I built and ran the department's server room and the platform inside it, in my role as IT Technician.
- A purpose-built server room with conditioned power, cooling and fire suppression, in place of equipment spread across offices.
- A virtualisation layer that moved the core applications off individual machines, so a service was no longer tied to one box.
- An offsite data link to a provincial data centre in another city, so a copy of the data existed outside the building that produced it.
How it works
This was a client engagement, so I describe the decisions and not the topology, addressing or equipment.
- Power, then cooling, then suppression. The room is only as reliable as its weakest support system, and those three fail in a predictable order, so they were designed together.
- Separate the application from the machine. Virtualisation turns "this server is down" into "move the service", and turns hardware refresh from an outage into a planned task.
- Put a copy outside the building. The offsite link protected against the failures the room could not, such as fire, flood or theft.
What I learned
Reliability is a chain, and I was responsible for finding the weak link. The most valuable skill from this work was not a product, it was asking what happens to the service when each part fails.
Facilities are part of IT. Power and cooling decide uptime more often than software does, so they belong in the design from the start.